Belgium (Europe)

  • Rolling Stock Expert , Maintenance Workshop Manager & Design Engineer for STIB-Brussels (1975-2006)
  • Philippines

    • Rehabilitation of 1st generation trains LRTA-Line1 (1998-2000)
    • Coupling 1st generation trains into 3-car configuration LRTA-Line 1
    • Restoration of 10 down cars LRTA-Line 1 (2005)
    • Supply of track materials LRTA-Line 1/LRMC
    • Supply of Zagro/Zweiweg unimog vehicles & spare parts
    • Supply of track materials LRTA-Line 2
    • Supply of track materials MRT-Line 3
    • Sourcing used service vehicles in Europe
    • Management and Supervision local Workers in Projects (see Our Accomplishments)
    • Daxi S.A.'s Project Manager in the North Extension Project ( NEP)
    • Representing Daxi S.A. in its Supply of Track Materials
    • Engeneering for Manila TREN consortium, field Cost estimate, Work methodology and monitoring/reporting Track Vibrations LRTA Line 1
    • Design for HVAC, plumbing & Fire Protection
    • Supervision Installation of Mechanical Equipments for PHPC Ltd., Inc
    • Design Engineer/Project Coordinator for UNICONSULT Planners
    • Installation, supervision, commissioning of Telecommunication equipment

    Message Us